Project summary
The commercial office building at Central Park required a full colour refresh of the aluminium curtain wall frames and window surrounds. The existing coating had oxidised and the frames had faded inconsistently across different elevations, undermining the building's appearance and occupier appeal.
Vanda Coatings carried out a phased programme of works, masking glazing and building fabric on each elevation in turn before applying a two-pack acrylic topcoat in a dark anthracite specification. MEWP access was deployed on the principal entrance elevation and a mobile scaffold tower was used across the lower-level window sections.
- Full mechanical preparation and degreasing of all aluminium frames
- Glazing, cills and adjacent masonry fully masked before each spray phase
- Two-pack acrylic topcoat in dark anthracite applied across all elevations
- MEWP and mobile scaffold tower deployed for access
- Works phased to keep all building entrances operational throughout
- Snag inspection and full sign-off on completion