Project summary
The client required recoating of steel roller shutter doors that had become faded, chalked and showing early signs of surface corrosion. The brief was to restore the finish to a clean, consistent colour with a durable topcoat, all without disrupting site operations.
- Full mechanical preparation and degreasing prior to coating
- Anti-corrosion primer applied to all affected areas
- Two-pack acrylic topcoat, long-term durability in exterior exposure
- Colour-matched to original specification
- Works completed in situ, no removal of shutters required
- Site remained operational throughout