Project summary
200 Degrees Coffee required a recoat of the shop front at their Nottingham city centre location. The aluminium frames and entrance metalwork had lost colour and adhesion, and a full preparation and recoat cycle was required to restore the brand-specification dark finish and protect the substrate against further deterioration.
- All aluminium shop front frames degreased and abraded
- Entrance surround, door frames and sills included in scope
- Adhesion primer applied across all surfaces
- Two-pack acrylic topcoat in the specified dark colour
- Coffee shop remained open to customers throughout
- Works completed outside peak trading hours where required